December 2013
Merry Christmas
Merry Christmas and a happy new year from all at Flower Michelin.
 


homepage8.jpg

December 2013
Holland Park Road – Project Started on Site
Work began on site for this one bedroom flat internal refurbishment in Holland Park.
 


funtington2.jpg

December 2013
Funtington - Planning Consent
Full new build family home with basement in Funtington.
 


5.jpg

November 2013
Elm Park Gardens - Project Started on Site
Works commenced on site to join these two separate flats, one a ground floor garden apartment, and one a redundant basement storage area.

 


October 2013
Battersea – Planning Consent
Planning consent has been received from Wandsworth Council for this two five bedroom house development. A new basement level stretching under the entire plot, as well as rear and roof extensions have been permitted to both properties, a combined gain in floor space of 328 square metres.


P1000953.JPG

October 2013
Stanhope Gardens - Project Completion
Stanhope Gardens is now complete. This four bedroom house underwent complete refurbishment, with a new single storey infill at third floor level.
 


September 2013
Motcomb Street – Press Releases
Motcomb Street (completed July 2013) has received a great deal of interest from various publications. Please see the press page for these publications.

link to project


August 2013
Eaton Mews – Project Started on Site
Work began on site for Phase 01 of this project, a three storey Mews House in the Belgravia Conservation Area within the Grosvenor Estate. Phase 01 includes excavation of new basement and full demolition with retained front façade. The 20 week Phase 01 is to be followed immediately by Phase 02: full re-build and fit-out.

link to project


July 2013
Motcomb Street – Project Completion

The ON Motcomb store, a double shop-unit over the Ground and Basement floors of a Grade II Listed Building within the Belgravia Conservation Area and the Grosvenor Estate, is now completed. It is the first boutique in London to carry this exclusive edit of evening wear straight from International Catwalks (London, Paris, Milan and New York) and from the very best Designers and emerging brands.

link to project


June 2013
Little Boltons - Planning Consent
Planning consent has been received from RBKC for two new basement levels and two storey rear extension to this six bedroom house in the Boltons Conservation Area, a gain in floor space from 492 sq m (existing) to 1163 sq m (approved proposed)

link to project


March 2013
Fulham Park Gardens - Project Completion
The works to this six bedroom house included complete refurbishment with rear extension and a full basement. Fulham Park gardens took 14 months to complete.

link to project


January 2013
Upper Mall - Project Completion
After 12 months the works at Upper Mall are now complete. This five bedroom house was fully refurbished with a two storey rear and roof extension.

link to project


xmas 3 hp ed.jpg

December 2012
Merry Christmas

Merry Christmas from us all at Flower Michelin
 


front elevation.jpg

November 2012
Elysium Place - Listed Building Consent
Listed Building Consent for a new three-storey mews house within the curtilage of the Grade II Listed Building, Northumberland House. 
 


Albert COurt.jpg

October 2012
Albert Court - Listed Building Consent
Listed Building Consent for reconfiguring and refurbishing this split level five bedroom apartment in the Grade II Listed Building.
 


August 2012
Astons Road - Planning Consent
Planning Consent has been obtained from Three Rivers for the full refurbishment and extension of this four storey property in the Moor Park Conservation Area


July 2012
Clink Street - Project Completion
Internal refurbishment and alteration of this historic warehouse conversion located along the bank of the River Thames is now complete.

link to project


May 2012
Hamble - Project Commencement on site
Work has begun for the full refurbishment of this six bedroom Art Deco house in Port Hamble Marina, with new glazed link extension and landscaping

link to project